Why we stopped breaking down stories into tasks An Article by Adam Silver adamsilver.io The Scrum process says to break down stories into tasks to make estimation easier, encourage collaboration and to be able to show more granular progress during a sprint. But after a few sprints, we decided to do the next sprint without creating tasks. As a result we drastically increased our velocity and never went back. Here I'll jot down some of the reasons we decided to do this: Breaking down stories into tasks is time consuming The tasks we came up with invariably would change as we worked on the stories Tasks are repetitive Tasks were often carried out in parallel Our estimates didn't improve It decluttered our task board It encouraged collaboration throughout the sprint While we started our process by following Scrum to the letter, we soon realised that breaking down stories into tasks was something that wasn’t worthwhile for us. In the end we realised that it was overplanning and poor use of our time. In the end we used that time to get on with the work and deliver at a significantly faster pace. Why We Don't Do Daily Stand-Ups at Supercede agile
A grossly obese set of requirements Who advocates in the requirements process for the product itself—its conceptual integrity, its efficiency, its economy, it’s robustness? Often, no one. As often, an architect or engineer who can offer only opinion based on taste and instinct, unbuttressed as yet by facts. For in a classical Waterfall Model product process, requirements are set before design is begun. The result, of course, is a grossly obese set of requirements, the union of many wish lists, assembled without constraints. Usually, the list is neither prioritized nor weighted. The social forces in the committee forbid the painful conflicts occasioned by even weighting, much less prioritizing. Frederick P. Brooks, Jr., The Design of Design Requirements proliferationA Plea for Lean Software features