No ordinary objects Abandoned by the world, no longer of use, but still carefully repaired and preserved, these were no ordinary objects. The reasons for their maintenance remain a mystery. At this point, they could only be described as "art". No—not so much "art" as something that exceeds art... Hyperart. Genpei Akasegawa & Matt Fargo, Hyperart: Thomasson artrepairthomassonsobjects
Hyperart: U.S. Rail The steepest grade on U.S. main-line track is at the small town of Saluda, on a Norfolk Southern route between Spartanburg, South Carolina, and Asheville, North Carolina. The grade goes on for three miles at a slope of 4 or 5 percent. Trains have not been running on the line since 2001, but the tracks are still maintained. Brian Hayes, Infrastructure: A Guide to the Industrial Landscape thomassonsgeographytransportation
Thomassons This was 1982, the year that Gary Thomasson was batting cleanup for the Yomiuri Giants. Thomasson had the unfortunate nickname of "The Electric Fan", which, if you think about it, was exactly what he was. Night after night, he stood in the batter's box, whiffing mightily at the ball, down on three strikes every time. He had a fully-formed body and yet served no purpose to the world. And the Giants were still paying a mint to keep him there. It was a beautiful thing. I'm not being ironic here either. Seriously, I can't think of any way to describe Gary Thomasson but as "living hyperart". Genpei Akasegawa & Matt Fargo, Hyperart: Thomasson sportsthomassons
Building Momentum An Article by Dan Mall danmall.com Fight the Waterfall Start all of the pieces of work a little bit earlier. The key to starting work early is not succumbing to the pressure of having to finish the work. Don’t worry about finishing. If you’re a developer, you can start doing things while your design or information architect are working because a lot of your work actually isn’t dependent on their work. Some of it is, so you probably won’t be able to finish, but that shouldn’t stop you from starting. Share Work-in-Progress Early and Often When you share work-in-progress, share it with the caveat that no feedback is needed at this point. You’re simply sharing it to let people know where you are. For example, if you have to make 12 wireframes, share it when you finish 2 or 3. Rather than spending a whole week to drop 12 wireframes, share 2 – 3 wireframes every 2 days. The more often you do this, you start to build rhythm, and rhythm builds momentum. processworkcollaboration