This flight of steps runs up the outside of a Modernist house in Switzerland. What is striking here is the precise construction of relationships. The gaps between steps allow crisp lines of light to fall on the darkly shadowed wall, reinforcing the subtlety of the dialogue between granite and the concrete, which has been bush-hammers to expose the stone aggregates.
...There is something hypnotic about stair climbing, and as often as I find myself thinking I ought to be at the fourth floor when I am only at the third, I think I've only gotten to three when I'm actually arriving at four.
...To my eyes (and legs) the straight run is more elegant and enjoyable to ascend.
...The narrowing is both functional and artistic, acknowledging that a stair is likely to be used by a smaller number of people as it rises and forcing the perspective narrowing of the long view upward.
...The symbolic weight of stairs is embodied in both their form and their magnitude.
For two and a half months I did not see a stairway in America. They are something that has been buried...hidden behind a door that you are not supposed to open.
Start all of the pieces of work a little bit earlier. The key to starting work early is not succumbing to the pressure of having to finish the work. Don’t worry about finishing. If you’re a developer, you can start doing things while your design or information architect are working because a lot of your work actually isn’t dependent on their work. Some of it is, so you probably won’t be able to finish, but that shouldn’t stop you from starting.
Share Work-in-Progress Early and Often
When you share work-in-progress, share it with the caveat that no feedback is needed at this point. You’re simply sharing it to let people know where you are. For example, if you have to make 12 wireframes, share it when you finish 2 or 3. Rather than spending a whole week to drop 12 wireframes, share 2 – 3 wireframes every 2 days. The more often you do this, you start to build rhythm, and rhythm builds momentum.