Not all the towers along a transmission line are identical. Look closely at a tower where the line makes a sharp turn and you will likely find it is wider and beefier than other towers along the route. The added strength and weight are needed to resist the unbalanced pull of the conductors, which might overturn an ordinary tower. These special towers are called deviation or angle towers.
The transmission-line tower everybody knows is an Erector Set latticework of steel girders and diagonal braces. The techniques for designing and building these towers are the same ones used in constructing steel bridge trusses or crane booms. The individual pieces can be made cheaply from rolled steel and then bolted together on the site. This last point is more important than it might seem: transporting a fully assembled tower 100 feet tall is an awkward and expensive business.
The mandate from above is clear, just get it done! Avoid everything that's in the way: all advice, all expertise, all discovery efforts that detract from hitting the Date™!
What these organizations don't realize is that all software change can be modeled as three components: Value, Filler and Chaos. Chaos destroys Value and Filler is just functionality that nobody wants. When date pressure is applied to software projects, the work needed to remove Chaos is subtly placed on the chopping block. Work like error handling, clear logging, chaos & load testing and other quality work is quietly deferred in favor of hitting the Date™.