Safety cut rope axe man In the first nuclear reactor, constructed by Enrico Fermi in 1942 under the bleachers of the University of Chicago football stadium, the control rods were held up by a manila rope. A man with an axe was told to cut the rope if the reactor got out of hand. This "safety cut rope axe man" is supposedly the origin of the term SCRAM for an emergency shutdown procedure. Brian Hayes, Infrastructure: A Guide to the Industrial Landscape wordsacronymsenergy
What went wrong? If something ships from one of the companies I advise, and it is virtually unusable because of poor design (which as we all know occasionally does happen), you can bet I go directly to the designer and ask how this happened? It is absolutely on the designer to ensure this does not happen, so something went wrong. Similarly, if the product ships and performance is terrible you can bet I go directly to the tech lead with the same question. And most frequently of all, if something ships and the analytics show that it’s either not being bought or not being used, or it turns out that it violates some business constraint like compliance or privacy, you can bet I go right to the product manager with that question. Marty Cagan, Product vs. Feature Teams svpg.com Viability, usablity, feasibility