Safety cut rope axe man In the first nuclear reactor, constructed by Enrico Fermi in 1942 under the bleachers of the University of Chicago football stadium, the control rods were held up by a manila rope. A man with an axe was told to cut the rope if the reactor got out of hand. This "safety cut rope axe man" is supposedly the origin of the term SCRAM for an emergency shutdown procedure. Brian Hayes, Infrastructure: A Guide to the Industrial Landscape wordsacronymsenergy
Building Momentum An Article by Dan Mall danmall.com Fight the Waterfall Start all of the pieces of work a little bit earlier. The key to starting work early is not succumbing to the pressure of having to finish the work. Don’t worry about finishing. If you’re a developer, you can start doing things while your design or information architect are working because a lot of your work actually isn’t dependent on their work. Some of it is, so you probably won’t be able to finish, but that shouldn’t stop you from starting. Share Work-in-Progress Early and Often When you share work-in-progress, share it with the caveat that no feedback is needed at this point. You’re simply sharing it to let people know where you are. For example, if you have to make 12 wireframes, share it when you finish 2 or 3. Rather than spending a whole week to drop 12 wireframes, share 2 – 3 wireframes every 2 days. The more often you do this, you start to build rhythm, and rhythm builds momentum. processworkcollaboration