Start all of the pieces of work a little bit earlier. The key to starting work early is not succumbing to the pressure of having to finish the work. Don’t worry about finishing. If you’re a developer, you can start doing things while your design or information architect are working because a lot of your work actually isn’t dependent on their work. Some of it is, so you probably won’t be able to finish, but that shouldn’t stop you from starting.
Share Work-in-Progress Early and Often
When you share work-in-progress, share it with the caveat that no feedback is needed at this point. You’re simply sharing it to let people know where you are. For example, if you have to make 12 wireframes, share it when you finish 2 or 3. Rather than spending a whole week to drop 12 wireframes, share 2 – 3 wireframes every 2 days. The more often you do this, you start to build rhythm, and rhythm builds momentum.
In his course Being Productive: Simple Steps to Calm Focus, Kourosh Dini emphasises the importance of taking a moment to “be with” the work every day (or however frequently you need to tackle a project). “Being with” your work is to be fully present and intentional about that activity and doing nothing else.
This idea was inspired by Dini’s piano teacher, who encouraged him to sit at his piano and touch the keys every day. Even on the days that he felt he had no time or inclination to practice. Sometimes touching the keys would lead to a good practice session, even when he didn’t feel like it would before he actually gave it a go.
Just like Dini, I find that once I give the task my full attention and be present, the actual doing of it turns out to be much easier and more enjoyable than my mind had been expecting. As usual, the resistance to getting started is far more uncomfortable than actually doing the thing.