Start all of the pieces of work a little bit earlier. The key to starting work early is not succumbing to the pressure of having to finish the work. Don’t worry about finishing. If you’re a developer, you can start doing things while your design or information architect are working because a lot of your work actually isn’t dependent on their work. Some of it is, so you probably won’t be able to finish, but that shouldn’t stop you from starting.
Share Work-in-Progress Early and Often
When you share work-in-progress, share it with the caveat that no feedback is needed at this point. You’re simply sharing it to let people know where you are. For example, if you have to make 12 wireframes, share it when you finish 2 or 3. Rather than spending a whole week to drop 12 wireframes, share 2 – 3 wireframes every 2 days. The more often you do this, you start to build rhythm, and rhythm builds momentum.
My heart belongs to the details.
I actually always found them to be more important than the big picture.
Nothing works without details.
They are everything, the baseline of quality.
Truly functional design only comes from the most careful and intense attention to detail.
Although he did not directly design all products and even had very little to do with some of them, he constantly encouraged tiny improvements that could make a good design better. This attention to detail ranged from the acuteness of angles in forms; the size, feels and distances between switches; the integration of handle fixings; the placement and nature of graphic elements on the products themselves and extended to product photography and packaging.
Designing detail is about achieving a fine balance in all aspects and areas of the product, including those external to the object.