Start all of the pieces of work a little bit earlier. The key to starting work early is not succumbing to the pressure of having to finish the work. Don’t worry about finishing. If you’re a developer, you can start doing things while your design or information architect are working because a lot of your work actually isn’t dependent on their work. Some of it is, so you probably won’t be able to finish, but that shouldn’t stop you from starting.
Share Work-in-Progress Early and Often
When you share work-in-progress, share it with the caveat that no feedback is needed at this point. You’re simply sharing it to let people know where you are. For example, if you have to make 12 wireframes, share it when you finish 2 or 3. Rather than spending a whole week to drop 12 wireframes, share 2 – 3 wireframes every 2 days. The more often you do this, you start to build rhythm, and rhythm builds momentum.
The most serious model shortcoming is that the designer often has a vague, incompletely specified goal, or primary objective. In such cases, the hardest part of design is deciding what to design.
I came to realize that the most useful service I was performing for my client was helping him decide what he really wanted.
Today, we recognize that rapid prototyping is an essential tool for formulating precise requirements. Not only is the design process iterative; the design-goal-setting process is itself iterative. Knowing complete product requirements up front is a quite rare exception, not the norm. Therefore, goal iteration must be considered an inherent part of the design process.