Start all of the pieces of work a little bit earlier. The key to starting work early is not succumbing to the pressure of having to finish the work. Don’t worry about finishing. If you’re a developer, you can start doing things while your design or information architect are working because a lot of your work actually isn’t dependent on their work. Some of it is, so you probably won’t be able to finish, but that shouldn’t stop you from starting.
Share Work-in-Progress Early and Often
When you share work-in-progress, share it with the caveat that no feedback is needed at this point. You’re simply sharing it to let people know where you are. For example, if you have to make 12 wireframes, share it when you finish 2 or 3. Rather than spending a whole week to drop 12 wireframes, share 2 – 3 wireframes every 2 days. The more often you do this, you start to build rhythm, and rhythm builds momentum.
I was thinking about this not long ago while reading in Petapixel an essay by a photographer named Scott Reither, “Long Form Study: Why Photographers Should Repeatedly Revisit A Scene.” In it, he described photographing one particular stretch of beach, over and over, throughout his career.
Of course that landscape has changed over time, and of course he’s had moments when he felt he’d captured the same territory so many times there was nothing left to see.
But there was always something more to see — maybe because of a change in Reither’s life, rather than in the physical environment.