Start all of the pieces of work a little bit earlier. The key to starting work early is not succumbing to the pressure of having to finish the work. Don’t worry about finishing. If you’re a developer, you can start doing things while your design or information architect are working because a lot of your work actually isn’t dependent on their work. Some of it is, so you probably won’t be able to finish, but that shouldn’t stop you from starting.
Share Work-in-Progress Early and Often
When you share work-in-progress, share it with the caveat that no feedback is needed at this point. You’re simply sharing it to let people know where you are. For example, if you have to make 12 wireframes, share it when you finish 2 or 3. Rather than spending a whole week to drop 12 wireframes, share 2 – 3 wireframes every 2 days. The more often you do this, you start to build rhythm, and rhythm builds momentum.
Who advocates in the requirements process for the product itself—its conceptual integrity, its efficiency, its economy, it’s robustness? Often, no one. As often, an architect or engineer who can offer only opinion based on taste and instinct, unbuttressed as yet by facts. For in a classical Waterfall Model product process, requirements are set before design is begun.
The result, of course, is a grossly obese set of requirements, the union of many wish lists, assembled without constraints. Usually, the list is neither prioritized nor weighted. The social forces in the committee forbid the painful conflicts occasioned by even weighting, much less prioritizing.