Start all of the pieces of work a little bit earlier. The key to starting work early is not succumbing to the pressure of having to finish the work. Don’t worry about finishing. If you’re a developer, you can start doing things while your design or information architect are working because a lot of your work actually isn’t dependent on their work. Some of it is, so you probably won’t be able to finish, but that shouldn’t stop you from starting.
Share Work-in-Progress Early and Often
When you share work-in-progress, share it with the caveat that no feedback is needed at this point. You’re simply sharing it to let people know where you are. For example, if you have to make 12 wireframes, share it when you finish 2 or 3. Rather than spending a whole week to drop 12 wireframes, share 2 – 3 wireframes every 2 days. The more often you do this, you start to build rhythm, and rhythm builds momentum.
The shape of a building has a great effect on the relative degrees of privacy and overcrowding in it, and this in turn has a critical effect on people’s comfort and well-being.
Solution
In small buildings, don’t cluster all the rooms together around each other; instead string out the rooms one after another, so that distance between each room is as great as it can be. You can do this horizontally—so that the plan becomes a thin, long rectangle; or you can do it vertically—so that the building becomes a tall narrow tower. In either case, the building can be surprisingly narrow and still work—8, 10, and 12 feet are all quite possible.