Why we stopped breaking down stories into tasks An Article by Adam Silver adamsilver.io The Scrum process says to break down stories into tasks to make estimation easier, encourage collaboration and to be able to show more granular progress during a sprint. But after a few sprints, we decided to do the next sprint without creating tasks. As a result we drastically increased our velocity and never went back. Here I'll jot down some of the reasons we decided to do this: Breaking down stories into tasks is time consuming The tasks we came up with invariably would change as we worked on the stories Tasks are repetitive Tasks were often carried out in parallel Our estimates didn't improve It decluttered our task board It encouraged collaboration throughout the sprint While we started our process by following Scrum to the letter, we soon realised that breaking down stories into tasks was something that wasn’t worthwhile for us. In the end we realised that it was overplanning and poor use of our time. In the end we used that time to get on with the work and deliver at a significantly faster pace. Why We Don't Do Daily Stand-Ups at Supercede agile
We want you to work with an artist Normally after the design was built, you would find places for the art to be located and then you would go out and select the artist that you wanted. That is historically, the traditional way to go. But this time, someone else was calling the shots. A planning official, basically, who comes along and says, “We want you guys to work with an artist.” And the architects are like, “Sure of course.” But then the official goes—“No, you don’t quite understand. We want you to use an artist as a co-equal member of the design team.” That is, the artists are going to have just as much control as the architects. It was really unheard of. Some Other Sign that People Do Not Totally Regret Life 99percentinvisible.org It passes by the river artcollaboration