Why we stopped breaking down stories into tasks An Article by Adam Silver adamsilver.io The Scrum process says to break down stories into tasks to make estimation easier, encourage collaboration and to be able to show more granular progress during a sprint. But after a few sprints, we decided to do the next sprint without creating tasks. As a result we drastically increased our velocity and never went back. Here I'll jot down some of the reasons we decided to do this: Breaking down stories into tasks is time consuming The tasks we came up with invariably would change as we worked on the stories Tasks are repetitive Tasks were often carried out in parallel Our estimates didn't improve It decluttered our task board It encouraged collaboration throughout the sprint While we started our process by following Scrum to the letter, we soon realised that breaking down stories into tasks was something that wasn’t worthwhile for us. In the end we realised that it was overplanning and poor use of our time. In the end we used that time to get on with the work and deliver at a significantly faster pace. Why We Don't Do Daily Stand-Ups at Supercede agile
Flow interesting (The Meander) The Meander (aka Menderes) is a river in Turkey. As you might expect, it winds all over the place. But it doesn't do this out of frivolity. The path it has discovered is the most economical route to the sea. The river's algorithm is simple. At each step, flow down. For the essayist this translates to: flow interesting. Of all the places to go next, choose the most interesting. One can't have quite as little foresight as a river. I always know generally what I want to write about. But not the specific conclusions I want to reach; from paragraph to paragraph I let the ideas take their course. Paul Graham, The Age of the Essay www.paulgraham.com Always produce interest